Here is the building layout. This shows us with our extended mezzanine level that we are currently raising funds to install. This will allow us more floor space and the ability to install our accessibility lift.
Ground Floor OverviewAlternative view of Ground Floor LayoutFirst Floor LayoutAlternative First Floor Layout
Ground Floor Areas
Main Workshop The grey tower is where we hope to install the accessibility liftEngineering – White cubes indicate tool locations including CNC and manual mills / lathesMessy Kitchen – Includes painting and drying areas, sink and washing, craft oven and hob and pottery wheelHot Works – Includes Welders, Plasma CNC Table, Power and hand tools, Material Storage and access to forge area at rear of buildingWoodworking area – Includes lathes, CNC, power and hand toolsKitchen Area – Includes Coffee machine, hot drink making facilities, tuck shop and full kitchenFront courtyard area – Includes Kiln and Sandblaster (both currently under reapir)
First Floor Areas
Media SuiteDetailing Room – Includes screen printer and airbrush as well as work areaElectronics Lab – includes soldering, test equipment and Ham radio Fab Lab – Includes a range of 3D printers as well as CNC and LasersSewing and Craft room – Includes an industrial sewing machine, pyrography, sublimation presses among othersView of Upper Level including proposed mezzanine extension (From white cube storage to grey ‘lift’ in the distance